Water
With over thirty years of experience on hundreds of civic and water district projects, Saylor brings a level of commitment, accuracy, and attention to detail unmatched in the industry. Our in-depth knowledge of municipal and water district construction, combined with our knowledge of area contractors, labor and market conditions, makes Saylor an ideal choice.
Saylor has worked with water districts throughout the state, including the San Francisco PUC, the Santa Clara Valley Water District, the Contra Costa Water District, Delta Diablo Sanitation District, and East Bay MUD.
The staff has combined experience on over 10,000 different facilities, including water and wastewater treatment plants, dams, pipelines, reservoirs, and water district administration buildings.
Bay Division Pipeline No. 5
East Bay Reach steel pipeline extending from the Irvington Tunnel to the Newark Valve Lot. This Peninsula Reach consists of a 60-inch diameter welded steel pipeline extending 9 miles from Ravenswood Valve Lot to Pulgas Tunnel Portal, within the existing SFPUC right-of-way of BDPL Nos. 1 and 2.
Location: San Francisco, CA
Project Cost: $141,000,000
Client: Kennedy Jenks Consultants/SFPUC